Red Flags Detected

  • Centurion Mine Production Issues (worsened) — Longwall faulting constrained October production to ~45k tons and delayed the next longwall move to Q3 2027.
  • Anglo American Arbitration Damages (worsened) — Anglo quantified damages at ~$755 million; Peabody cannot estimate a possible loss.
  • Operating Cash Flow Decline (worsened) — Operating cash flow fell 89.7% to $27.2 million for the nine months.
NYSE: BTU PEABODY ENERGY CORP 10-Q

Peabody Q3: revenue up 8.3% to $1.10B, net loss narrows 53.2% to -$32.8M; Centurion mine issues and Anglo arbitration loom

Filed November 6, 2026 · Period ending September 30, 2026 · Compared to 10-Q Nov 7, 2025 · ~1 min read

Key Changes

  • high

    Centurion Mine longwall hit unexpected faulting, cutting October production to ~45k tons; next longwall move delayed to Q3 2027.

    MD&A: Centurion Mine verify on EDGAR →
  • high

    Anglo American quantified its arbitration damages claim at ~$755 million; Peabody disputes and has counterclaimed, but loss is reasonably possible.

    MD&A: Anglo arbitration verify on EDGAR →
  • high

    Operating cash flow fell 89.7% to $27.2 million for the nine months ended Sept 30, 2026, from $265.1 million a year earlier.

    MD&A: Liquidity verify on EDGAR →

2 more material changes behind this preview — plus the full narrative summary, section-by-section diffs against the prior filing, and verbatim quotes with EDGAR citations.

Read 3 full reports/month free No card required. Takes 30 seconds.

Want to see a complete report first? Today's free report (OWL 10-Q) is open in full — no account needed.

Partner

Trade BTU commission-free

Open an account, get a free stock.

Sign up

Investing involves risk. Free stock terms apply.

Was this report useful?

Figures/quotes linked to EDGAR · Narrative written by AI · Nov 9, 2026 · How we verify